317.359.5411 3914 Prospect Street, Indianapolis, IN 46203
← Back

Where is Wilhelm Construction?

Wilhelm Construction can be found several places throughout town, maybe even right down the street from you! Learn more about other projects in the coming weeks.

Roberts Hall, University of Indianapolis
Roberts Hall, due to open August 2012, will be located between Warren and Cravens halls on the University of Indianapolis’ campus. Wilhelm Construction is serving as general contractor on the more than 200-room men’s and women’s dorm. Large lobbies, glassed-in patio and fireplace will provide gathering and study spaces. The five-story building will feature load-bearing, aerated autoclaved concrete (AAC) with AAC floor planks.

 

 

 

 

Noblesville CSO Project
Wilhelm Construction is serving as general contractor on the City of Noblesville’s combined sewer overflow city improvement project. Work onsite includes building an underground combined sewer overflow holding tank and a new 60-foot outfall pipe 1700 feet long. Additionally, a new digester building is being constructed and renovations of two existing generators are underway. This will dramatically affect the storm/sewer drains in heavy rains relieving backup.

Leave a Response